API 650
15,000barrels
Storage tank
A 15,000-barrel tank fabricated and welded on site, with nondestructive testing on every joint.
The process
A storage tank is built where it will stand: floor, shell courses and roof are fitted and welded on site, and every joint is tested before the hydrostatic test.
01PreparationJoint preparation on a structural steel section.
02WeldingJoint welded on site by the field crew.
03ProtectionProtective coating applied by spray gun.